How to Safely Acquire Landed Property (Helpful Legal Hints)



Unfortunately, some people part with their hard earned money of which the legal and factual status they knew nothing about because they throw away caution any patience whenever they wish to purchase landed property and of course they end up litigation and ever lingering problem which some time surface immediately after payment, most of those problems are avoidable if you follow some of the hints provided below:

A.     RIGHT ATTITUDE

                     i.            Never be in a hurry to acquire or part with your money, it’s advisable to do the   right  thing even if it will cost you the transaction, count if it’s for good, no regret.
                         
     ii.            Don’t ever assume, be sure what you want is what you get.
                         
   iii.            Beware of those agent who say “trust me now”
                        
    iv.            Investigate every offer, if need be engage a professional to do that
                            
    v.            Be wary with property with unusually low price.


B.      INVESTIGATE THE PROPERTY THAT IS OFFERED TO YOU

There are many ways to investigate or conduct search over a property that is offered for sale.
Remember the aims of your investigations are:


              i.            To reveal the genuineness or otherwise of the offer.

 ii.            To reveal the actual title in respect of the property, whether its title is a legal one or equitable one, so that you can be put in a better position to understand the risk  that surrounds the property. The title can be documentary or traditional history i.e. family ownership.

 iii.            To reveal the identity and capacity of the seller and see whether there is any nexus between the seller and the property or documents pertaining to it.


  iv.            To reveal whether there is any encumbrance or inhibition on the property or the             right of the seller to sell. Encumbrance can arise from as a result of government acquisition, or court action or mortgage or whether there is a right of a third party over the property or it’s a subject of dispute in any form.

                                    v.         To see whether if you eventually buy the property, your interest in it can be legally  perfected, and secure or not.

                               vi.         To see whether if you eventually buy the property, taking possession will not become a problem.

  vii.         To see whether there are natural or environmental problems (patent or latent) in the neighborhoods of the land which may prevent you easy access or deny you peaceful and quiet enjoyment of the land

 viii.         To reveal the nature of the interest or title of the seller whether it is leasehold or absolute interest.

                     
    

Comments

Popular posts from this blog

Construction Procedure of Surface Road Side Drainage-PART 1 (with picture)

Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc are channeled to a main drain naturally or through a constructed channel which is referred to as drainage. Procedure for construction of a common drainage (trench) (1m x 1m U drainage) (reinforced). includes; I.       Marking Of Alignment: The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the trench to be excavated with a mechanical excavating machine. For a 1m x 1m drainage, the mathematical process of obtaining the required dept is to sum together the dept of the required drain + base + blinding. For dept:  A drain of dept1000 mm, base of 150 mm and blinding of 50 mm. Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the road surface. For width:

Construction Procedure of Surface Road Side Drainage-PART 2 (with picture)

  V.        Next step is laying of concrete base on the blinded surface and the positioned reinforcement. A concrete base of 150 mm is to be laid or cast on the blinded floor, concrete grade C20 of ratio 1:2:4 is allowed (See concrete grading and mix ratio). A guiding panel is placed into position to guild in the laying of the concrete base in order to achieve a uniformly alignment base edge, thickness and width, also to manage concrete material while pouring. The base is cast with the U shape reinforcement bottom in between the concrete base achieving concrete cover below and above.   VI.        After setting and drying of the concrete base, next is to position the side wall panel form work. The floor base is marked to give the required one meter (1000 mm) internal width where the panel will be positioned. The panel wall spacing is 100mm, and wall height of 1000mm (1 meter), the panel is lubricated, clipped and prepared to accept the Concrete.

Setting out of a building

A building is set out in order to accurately define the outline and width of the excavation and to determine the center line of the proposed building walls, so that construction according to the building professionals drawing (the architectural plan) plan can be transfer into the ground, this building process is called setting out of building. The center line method of setting out is generally preferred and adopted Setting out can be a very complex engineering process but with need experience its quite easy. Experienced engineer and surveyors are those involved in setting out of structures, in large projects, services of land surveyors are required for more accurate transfer of levels and angles in setting out with the aid of a Theodolite to decided point around the building area But we are going to concern ourselves with the most common setting out method ·          Setting out using pegging ·          Setting out using blocks. But here, we will be discussing