Skip to main content

Tips To Reduce Your Building Construction Cost.

1.  Draw the complete Architects/Building plan of your dream house by contracting the services of Builders, Architects, Draftsmen, or Civil Engineer.
     This is the first and best way to reduce cost.


2. Ensure design plan is well coordinated with all materials; personnel and other sequence of works i.e. soak away positioning, Bore-Hole location, generator house etc. and are well defined before commencement.


3.  For some many experience or financially capable builders, the next thing is sinking borehole or connects to any other available water source. The argument is that if you need sink borehole or connects to any other available water source, why not do that first at preparatory or beginning stage so u cut down on the cost of water during building.


4        Blocks molding in advance is another sure way of saving costs.
Mould the quantity of your needed blocks before commencing the projects proper. People don't know that a lot of money could be saved by molding the blocks instead of buying. However Endeavour to sink borehole or connects to any other available water source before embarking on block molding.
Though it is advisable to buy machines mould sandcrete blocks to hand mould blocks. machine mould blocks are stronger because they are well compressed/compacted compared to hand mould blocks, but you can guarantee a good quality of hand mould blocks by consistently sticking to the design mix and compaction through adequate supervision. How stronger will a block produced by a machine with improper mix ratio compared to a adequately manually produce compacted blocks, made of adequately supervised mix ratio?


5        Buy your granite/aggregates direct from the quarry.
From experience purchasing tipper/truck bucket of granite must b done with reliable or trustworthy dealer/supplier or there will be shortage of material measurement. See (link)


6.  If you are building on unstable soil, consult the services of building/civil engineer to avoid future damages to walls finishes and other services equipments/tools (i.e. pipping, tiles, painting etc) due to future wall cracking, sinking/moving of your home. When you constructs on a stable soil i.e. muddy, loamy or water log area, without treating the foundation, you are bound to regrets in future, because there will surly be a partial or complete collapse of your building see (foundation type link)

If you are building on a rocky plot of land, the building cost might be higher. But you can reduce the cost by using the rocks as part of the house, its called rock cracking. Crack the rocks into shapes and sizes to be used as aggregates when casting the foundation concrete, filling the base vacuum of your D.P.C up to the brim before leveling it with suitable lateritic material then cast your D.P.C or German floor on top.


7        Excavate for the soak-away according to the design location during the course of your foundation construction. Use suitable sand materials from soak-away to fill the foundation trench. Though might not be adequate due to quantity demand, but must have save cost. Hence, prepare to buy more filling, and then lay the German floor/D.P.C. This must have reduced the cost of sand required to fill up your foundation trench.


8        Buy most materials by yourself if possible. Most material cost is overestimate. But this might back fire if you are a greedy type


9        Contract out the block wall erecting work/laying to an experienced bricklayer/mason after obtaining 3 or more cost quotations to save cost and time.

NB: presence of professional is needed to check and confirm each stages of construction if it’s being build according to the architectural plan design or not,
Contracting should be limited to bungalow/Ground floor building, for storey/multi-floor building; the sole supervisor/contractor should be the site engineer.

10.        Do the roof carcass/skeleton and ceiling noggin together.
If you do your roofing wood work, and then later contacts the carpenter to come and do the ceiling noggin, that will greatly increase the roofing cost and time. Do both together to cut down on time and resources.

11.        Abortive works due to poor planning and reworks due to poor quality work executions are the major reasons for excessive cost overruns, avoid this.
Do proper planning, sit down and talk to 2 or more professional before commencing if you are still in the dark about the tips above.




12. N: B.

Tips to reduce your building finishes cost not included in this write-up.





If you are still in the dark about the tips above. u may Whatsapp me, lets discuss: +2348151904504






Pleases don’t just Read but Recommend, Share to others, and kindly leave comments below for others to follow

Comments

Popular posts from this blog

Setting out of a building

A building is set out in order to accurately define the outline and width of the excavation and to determine the center line of the proposed building walls, so that construction according to the building professionals drawing (the architectural plan) plan can be transfer into the ground, this building process is called setting out of building. The center line method of setting out is generally preferred and adopted Setting out can be a very complex engineering process but with need experience its quite easy. Experienced engineer and surveyors are those involved in setting out of structures, in large projects, services of land surveyors are required for more accurate transfer of levels and angles in setting out with the aid of a Theodolite to decided point around the building area But we are going to concern ourselves with the most common setting out method ·          Setting out using pegging ·      ...

Construction Procedure of Surface Road Side Drainage-PART 1 (with picture)

Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc are channeled to a main drain naturally or through a constructed channel which is referred to as drainage. Procedure for construction of a common drainage (trench) (1m x 1m U drainage) (reinforced). includes; I.       Marking Of Alignment: The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the trench to be excavated with a mechanical excavating machine. For a 1m x 1m drainage, the mathematical process of obtaining the required dept is to sum together the dept of the required drain + base + blinding. For dept:  A drain of dept1000 mm, base of 150 mm and blinding of 50 mm. Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required...

Ring / Pipe Culverts Construction procedure

Culvert is an open/close drain structure that allows water to flow below a road. It’s like a tunnel carrying a stream of water flow. A Ring/Pipe Culvert Procedure for construction of a common Ring/Pipe Culvert (road junction culvert) includes; I.       Marking Of Alignment: - The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the culvert to be excavated with an excavating machine. For a 1m pipe culvert, the mathematical process of obtaining the required dept is to sum together the total width of the pipe + base + blinding. For dept:  A pipe of width 1000 mm, base of 150 mm and blinding of 50 mm (though optional). . Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the natural ground (sub grade level) surface. For wid...