Skip to main content

List of Tallest building in Nigeria


1.) Nitel Building Lagos 160 M (520 Ft.), 32 Floors, Completion Date: 1979





2.) Union Bank Headquarters Building, Lagos. 124 M (407 Ft), 28 Floors. Completion Date;??
   




3.) Cocoa House Ibadan. 105 M (344 Ft.), 6 Floors, Completion Date; 1965





4.) Independence House Lagos 103 M (388 Ft.), 23 Floors Completion Date; 1960 




5.) Intercontinental Hotel Lagos 100 M (330 Ft) 22 Floors Completion, 2013




6.) Great Nigeria House Lagos. 95 M  (312 Ft.), 22 Floors, Completion Date ; ??




7.) National Oil Headquarters Lagos 83 M (272 Ft) 23 Floors, Completion Date; 1984




8.) Stock Exchange House Lagos, 83 M (272 Ft) 22 Floors, Completion Date;??



9.) Uba House Lagos, 80 M (260 Ft)   20 Floors, Completion Date;??




10.) Eagle House, Lagos 78 M (256 Ft)   20 Floor Completion Date; 1985   




11.) Nigerian National Petroleum Corporation Towers Abuja 75 M (246 Ft)   15 Floors Completion               Date: 1996














12.) Afribank Plaza, Lagos 73 M (240 Ft)   19 Floors Completion Date; 1996



13.) Freeman House, Lagos 70 M (230 Ft)   18 Floors Completion Date;??






Under Construction

14.) Abuja Stratosphere Abuja 265 M (869 Ft), 64 Floors Expected Completion Date:???

Comments

Popular posts from this blog

Construction Procedure of Surface Road Side Drainage-PART 1 (with picture)

Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc are channeled to a main drain naturally or through a constructed channel which is referred to as drainage. Procedure for construction of a common drainage (trench) (1m x 1m U drainage) (reinforced). includes; I.       Marking Of Alignment: The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the trench to be excavated with a mechanical excavating machine. For a 1m x 1m drainage, the mathematical process of obtaining the required dept is to sum together the dept of the required drain + base + blinding. For dept:  A drain of dept1000 mm, base of 150 mm and blinding of 50 mm. Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the road surface. For width:

Construction Procedure of Surface Road Side Drainage-PART 2 (with picture)

  V.        Next step is laying of concrete base on the blinded surface and the positioned reinforcement. A concrete base of 150 mm is to be laid or cast on the blinded floor, concrete grade C20 of ratio 1:2:4 is allowed (See concrete grading and mix ratio). A guiding panel is placed into position to guild in the laying of the concrete base in order to achieve a uniformly alignment base edge, thickness and width, also to manage concrete material while pouring. The base is cast with the U shape reinforcement bottom in between the concrete base achieving concrete cover below and above.   VI.        After setting and drying of the concrete base, next is to position the side wall panel form work. The floor base is marked to give the required one meter (1000 mm) internal width where the panel will be positioned. The panel wall spacing is 100mm, and wall height of 1000mm (1 meter), the panel is lubricated, clipped and prepared to accept the Concrete.

Ring / Pipe Culverts Construction procedure

Culvert is an open/close drain structure that allows water to flow below a road. It’s like a tunnel carrying a stream of water flow. A Ring/Pipe Culvert Procedure for construction of a common Ring/Pipe Culvert (road junction culvert) includes; I.       Marking Of Alignment: - The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the culvert to be excavated with an excavating machine. For a 1m pipe culvert, the mathematical process of obtaining the required dept is to sum together the total width of the pipe + base + blinding. For dept:  A pipe of width 1000 mm, base of 150 mm and blinding of 50 mm (though optional). . Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the natural ground (sub grade level) surface. For width: A minimum of (2.5 x width) m is advisable.