Skip to main content

Before negotiating for that Aluminum,step Tiles roofing sheets.-cost and specifications, what you need to know

coated step tiles roofing sheets


                             Aluminum Roofing Sheets, All Types/Price Per Square-Meter


                                                           Sales and Installation


Understanding the cost of  building project and especially cost of roofing materials is imperative to minimize unnecessary lost to suppliers or the contractors. The objective is to help you have in mind the average cost of building material in the country.
pls leave a comment if you find it helpful


SALES

STEP TILES - ALUMINIUM SHEETS/TILES: 

0.45mm Step Tile cost --------------------------------------------------------------=N980 per square-meter
0.55mm Step Tile cost---------------------------------------------------------------=N1, 250 per square-meter


LONGSPAN - ALUMINIUM:

0.45mm Long span cost-------------------------------------------------------------- =N980 per sq-meter
0.55mm Long span cost---------------------------------------------------------------=N1,100 per sq-meter



Heritage Tiles (Made in Korea) -----------------------------N2,400 per sq-meter with 50years warranty
Heritage Tiles (Made in Korea) ------------------------------N2,200 per sq-meter with 20 years warranty
Heritage Tiles (Made in Belgium)--------------------------- N3,400 per  sq-meter with 50years warranty
Heritage Tiles (Made in New Zealand)----------------------N4,100 per sq-meter with 50years warranty


Shingle Tiles (Made in Korea)--------------------------------N2,900 per sq-meter with 50years warranty
Shingle Tiles (Made in Belgium) ----------- -----------------N4,200 per sq-meter with 50years warranty
Shingle Tiles (Made in New Zealand)-----------------------N4,200, N6,200 etc (due to different design)                                                                                                          per sq-meter with 50years warranty

Classic Tiles (Made in Korea)---------------------------------N2,400 per sq-meter with 50years warranty
Classic Tiles (Made in Korea) --------------------------------N2,400 per-meter  with 20 years warranty
Classic Tiles (Made in Belgium)----------------------------- N3,700 per-meter with 50years warranty
Classic Tiles (Made in New Zealand)------------------------N4,200 per-meter with 50years warranty

Roman Tiles (Made in Korea)--------------------------------N3,100 per-meter with 50 years warranty
Roman Tiles (Made in Belgium)---------------------------- N4,200 per-meter with 50years warranty
Roman Tiles (Made in New Zealand)-----------------------N4,200 per-meter with 50years warranty



ACCESSORIES:

Ridge Cap--- ----------------------------------------------------------------------------------=N 1,200 / meter
Valley Gutter ----------------------------------------------------------------------------------=N=1,300 / meter
facial board cover ----------------------------------------------------------------------------=N1,300 / meter
Treated nails-----------------------------------------------------------------------------------=N1,000 per KG
Bash board cover------------------------------------------------------------------------------=N1,300 / meter
Sealant ------------------------------------------------------------------------------------------=N3,500 A Pack
repair kit ----------------------------------------------------------------------------------------=N 5,000


INSTALLATION:
Per Square Meter ----------------------------------------------------------------------------=N200  -  =N300






source:

Arc. ashmark. 

ashmark constructions

ashmarkconstructions@gmail.com















Comments

Popular posts from this blog

Construction Procedure of Surface Road Side Drainage-PART 1 (with picture)

Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc are channeled to a main drain naturally or through a constructed channel which is referred to as drainage. Procedure for construction of a common drainage (trench) (1m x 1m U drainage) (reinforced). includes; I.       Marking Of Alignment: The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the trench to be excavated with a mechanical excavating machine. For a 1m x 1m drainage, the mathematical process of obtaining the required dept is to sum together the dept of the required drain + base + blinding. For dept:  A drain of dept1000 mm, base of 150 mm and blinding of 50 mm. Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required...

Construction Procedure of Surface Road Side Drainage-PART 2 (with picture)

  V.        Next step is laying of concrete base on the blinded surface and the positioned reinforcement. A concrete base of 150 mm is to be laid or cast on the blinded floor, concrete grade C20 of ratio 1:2:4 is allowed (See concrete grading and mix ratio). A guiding panel is placed into position to guild in the laying of the concrete base in order to achieve a uniformly alignment base edge, thickness and width, also to manage concrete material while pouring. The base is cast with the U shape reinforcement bottom in between the concrete base achieving concrete cover below and above.   VI.        After setting and drying of the concrete base, next is to position the side wall panel form work. The floor base is marked to give the required one meter (1000 mm) internal width where the panel will be positioned. The panel wall spacing is 100mm, and wall height of 1000mm (1 meter), the pan...

Setting out of a building

A building is set out in order to accurately define the outline and width of the excavation and to determine the center line of the proposed building walls, so that construction according to the building professionals drawing (the architectural plan) plan can be transfer into the ground, this building process is called setting out of building. The center line method of setting out is generally preferred and adopted Setting out can be a very complex engineering process but with need experience its quite easy. Experienced engineer and surveyors are those involved in setting out of structures, in large projects, services of land surveyors are required for more accurate transfer of levels and angles in setting out with the aid of a Theodolite to decided point around the building area But we are going to concern ourselves with the most common setting out method ·          Setting out using pegging ·      ...