FACILITY INSPECTION CHECK LIST

         FACILITY:         
        
         DATE:    

                            
S/N
AUDIT ITEM
OK
NOT OK
DEFICIENCY
RECOMMENDATION
A
HSE AT ENTRY




1
SPDC HSE Policy Statement available and displayed.
Ö



2
MINERAL OIL SAFETY SIGN BOARDS  available and displayed.
Ö



3
CONDITION OF GATE/FENCE : Is the fence adequate to keep unauthorized people out of restricted operation areas?
Ö



4
Is the fence periodically inspected? If so how often and is the schedule available?
Ö



5
Is the 3 meter fire break surrounding the perimeter fence provided to prevent the spread of an accidental bush fire?
Ö



6
Is railing fitted where there is the possibility of failing into water or from a height of more than one?
Ö



7
Is railing fitted where there is the possibility of falling into the water or from a height of more than 1 meter?
Ö



8
MUSTER POINT Are Muster points adequately labeled?
Ö



9
Are safety signs (emergency exits, escape routes etc) prominently displayed?
Ö



10
Are any muster points or emergency exits obstructed?
Ö



11
Are evacuation/emergency notices strategically located throughout the facility
Ö



12
OPEN DRAINS Are the open drains clean?
Ö



13
Was entry permit requested from you before being allowed entry into facility?
Ö



14
SAFETY BRIEFING BY GUARDS
Ö



15
Were swimming passes checked prior to being allowed entry?

X


16
Is a log book kept of all people on the facility, the status of their swimming passes and any waivers?
Ö



17
Is this log book kept up to date?
Ö



18
For anyone not equipped with swimming passport- are appropriately signed waivers available?
Ö



19
FACILITY SAFETY PLOT PLAN

X
Facility general safety plot not available sighted
Focal point to prepare copies and keep at site
20
Are all people working on the facility wearing coveralls, safety glasses, hard hats and safety shoes?

X
Inability of warehouse to supply PPE’s on time (work vest especially) is hindering use of work vest.This was raised during the safety day session.

21
Are the PPEs properly worn?
Ö



22
Are high noise area maps present at the facility?
Ö



23
Are the high noise area maps up to date?
Ö



24
Are ear defenders worn by all people working in designated high noise areas?
Ö



25
Are all PPE signs visible?
Ö



26
Are the warning signs in hazardous areas visible?
Ö



27
Have provisions been made for the storage of PPE when not in use (e.g cup boards, lockers etc)
Ö



28
Is the PPE properly maintained?
Ö



29
Emergency Telephone numbers available and up to date

X
Sighted 2005 edition of  ER contract in Eku 2 FS.
Update and disseminate via livelink for ease of cascade.
B
DOCUMENTATION




30
PTW FILE IN PLACE
Ö



31
DISTRICT ACTION TRACKING SYSTEM IN PLACE
Ö


Presently stored on the network drive.HSE focal point should migrate to livelink.
32
RECORD OF LAST ESD CHECK
Ö

17/06/07

33
RECORD OF LAST FAIL SAFE CHECK
Ö



34
HAZARDOUS AREA DRAWING

X
Old and defaced.
HSE focal point to replace.
C
ROBERT SHAW PANEL




35
ON AUTO
Ö



36
ALARM(S) ON
Ö



37
BEACON OPERATIONAL
Ö



D
INLET MANIFOLD




38
LIGAMENT VALVES LEAKING
Ö



39
LAST TIME VALVES WAS GREASED
Ö



40
 CORK VALVES IN PLACE
Ö



41
LIGAMENT DRAIN VALVES IN PLACE
Ö



42
GRATING IN PLACE
    Ö



43
WELLS CORRECTLY LABELED
Ö



44
OPEN DRAINS CLEAN
Ö



45
WELL DISTRIBUTION
Ö



46
CONDITION OF VALVES
Ö



47
OTHERS




E
ESD VALVES LEAKING




48
LAST ESD TEST
Ö


Conducted 18/06/07 in Eku 2 FS
49
BYPASS VALVES PROVIDED
Ö



50
BYPASS VALVES OPEN
Ö



51
BYPASS VALVES TIED TO TAO
Ö



52
SUPPLY PRESSURE TO ACTIVATOR
Ö



53
CONDITION OF NATCO SWITCH
Ö



54
CONDITION OF QAW
Ö



55
HEADER RELIEF VALVE LEAKING
Ö



56
HEADER RELIEF VALVE TAGGED
Ö



57
FLARE SMOKY
Ö



58
OTHERS




F
PROCESS SKID




59
PRESSURE GAUGE MOUNTED ON SEPARATOR
Ö



60
LAST DATE PRESSURE GAUGES CHECKED

X


61
RELIEF VALVE TAGGED
Ö



62
RELIEF VALVE DUE FOR TESTING
Ö



63
RELIEF VALVE FLAPPER IN PLACE
Ö



64
VESSELS DUE FOR TESTING
Ö



65
LEVEL IN VESSEL
Ö



66
LEVEL SIGHT GLASS CLEAN
Ö



67
LEVEL CONTROLLER  FUNCTIONAL
Ö



68
DRAIN VALVE
Ö



69
DUMP VALVES
Ö



70
CONDITION OF SKID
Ö



71
CONDITION OF ROTRON METERS
Ö



72
CONDITION OF DOF
Ö



73
CONDITION OF BARTON METERS
Ö



74
BACK PRESSURE CONTROL VALVE OK
Ö



75
OTHERS (SV1)
Ö



G
PUMP HOUSE




76
PUMP HOUSE TIDY

X

Tidy up pump house area.
77
STARTER EXHAUST CONNECTED
Ö



78
EXHAUST PIPE LAGGED
Ö



79
RADIATOR TOP UP LINE IN PLACE
Ö



80
LUB OIL TOP UP LINE IN PLACE
Ö



81
CONDITION OF ENGINE
Ö



82
CONDITION OF  PUMP
Ö



83
CONDITION OF  PUMP RELIEF VALVE




84
CONDITION OF RECIRCULATION VALVE




85
RECORD OF LAST PUMP EFFICIENCY  TEST
Ö


Done Q1 2006
86
OTHERS




H
FUEL GAS SYSTEM




87
LEVEL  IN FUEL GAS SCRUBBER
Ö



88
AUTO DRAIN FUNCTIONING
Ö



89
PRESSURE IN FUEL GAS SCRUBBER
Ö



90
OTHERS (Relief valve)
Ö



I
CHEMICAL INJECTION




91
CONDITION OF TANK


Not presently in use.

92
CONDITION OF PUMP


Isolated

93
LIQUID METER FUNCTIONING




94
CONDITION OF SIGHT GLASS
Ö



95
TANK GAUGE PROVIDED
Ö



96
CHEMICAL FOR MIXING AVAILABLE
Ö



97
OTHERS (HAND PUMP)
Ö



J
GENERATOR HOUSE/ELECTRICITY




98
DIESEL TANK
Ö

None in FS

99
OPEN DRAIN MAINTAINED
Ö



100
GENERATOR VOLTAGE
Ö



101
GENERATOR CURRENT
Ö



102
GENERATOR FREQUENCY
Ö



103
STANDBY BATTERY




104
CHANGING CURRENT
Ö



105
EXHAUST PIPE LAGGED
Ö



106
CONDITION OF  PANEL
Ö



107
GENERAL CLEANLINESS
Ö



108
EARTHING SYSTEM ( ALL PIPE WORK)
Ö



109
HIGH VOLTAGE/DANGER SIGNS PRESENT IN RELEVANT AREAS
Ö



110
POWER PANELS  CLEARLY INDICATED




111
POWER PANELS LOCKED
Ö



112
ELECTRICAL SAFETY RULES AVAILABLE
Ö



113
EVIDENCE OF ELECTRICAL PORTABLE EQUIPMENT BEING PERIODICALLY INSPECTED BY APPROPRIATELY QUALIFIED.
Ö



114
ELECTRICAL PORTABLE EQUIPMENT EXPIRY DATES CLEARLY LABELLED

X


115
METALLIC STRUCTURES FITTED WITH LIGHTNING ARRESTORS
Ö



116
ALL SOCKETS, PLUGS & WIRING IN GOOD STATE OF REPAIR




117
ALL BUSHBAR SHUTTERS LOCKED SHUT




118
AN ELECTRICAL SWITCHBOARD PRESENT AT THE FACILITY & IN USE
Ö



119
ANTI-SHOCK MATS PRESENT NEAR SWITCH GEARS




120
ALL FUSIBLE FIRE PLUGS IN GOOD CONDITION (NOT BROKEN, BURNT OUT OR MISSING)




121
POWER CABLE TRAYS IN GOOD CONDITION




122
EARTH ELECTRODES IN GOOD CONDITION




123
POWER CABLES USED OUTSIDE APPROPRIATELY INSULATED WITH HEAVY DUTY NEOPRENE SHEATH & IN GOOD CONDITION




124
BARRIERS WHICH RESTRICT ACCESS TO AREAS ENCLOSING HV POWER CABLES LOCKED




125
OTHERS




K
FLARE




126
WALKWAY TO FLARE
Ö



127
CONDITION OF BURN PIT
Ö



128
CONDITION OF BUNDWALL
Ö



129
FLARE SMOKY
Ö



130
OTHERS




L
FIRE FIGHTING EQUIPMENT




131
What is the condition of the fire hut?
Ö



132
FIRE EXTINGUISHERS ADEQUATE?

X

Restore minimum stock in facility.
133
Are inspection due dates present on all fire extinguishers?
Ö



134
Are there any fire extinguishers with overdue inspection dates?
Ö



135
Is the location of the inspection schedule known to HSE staff?
Ö



136
Are all fire extinguishers easily sighted?
Ö



137
Are dry powder extinguishers available in the pump house in the event of electrical fires?
Ö



138
Are any water-based extinguishers present  at the SPDC facility?
Ö



139
Does a fire cabinet indicate minimum fire fighting stock required?
Ö



M

LIFE BUOYS /LIFE VESTS




140
Are sufficient life buoys present at the facility?
Ö



141
Are their locations clearly visible and labeled?
Ö



142
Are they attached to a fixed structure? (e.g flowstation grating)
Ö



143
Are lifebuoys in their allocated positions?
Ö



144
Are all personnel wearing life vests?
Ö



145
CONDITION OF FIRE BAT
Ö



146
CONDITION OF FIRE HOSE
Ö



147
CONDITION OF BRANCH PIPE




148
CONDITION OF HYDRANT POINTS

X
Sectional corrosion observed in Eku 2 FS.
Capture in mechanical upgrade
N
EYE WASH – SALINE SOLUTION




149
Are eye washes provided?
Ö



150
Are these in an acceptable state of repair and maintained?
Ö



151
Are they functioning?
Ö

Non functional eye wash by chemical shed in Eku 2 FS which is not in use should be taken out.

0
SAVER PIT




152
CONDITION OF PIT
Ö



153
QUALITY OF EFFLUENT WATER
Ö



154
CONDITION OF CP PUMP

X
CP pump supply line have corrosion leaks

155
CP PUMP DISCHARGING  TO
Ö



156
OTHERS




P
CP TRANSFORMER
N/A



157
CONDITION OF UNIT
N/A



158
COLOUR OF CILICA GEL
N/A



159
VOLTAGE/CURRENT METERS




Q

GUARD HUT




160
FACILITY PROVIDED ADEQUATE
Ö



161
TOILET AND WASH HAND BASIN
Ö



162
TABLES PROVIDED
Ö



163
LIGHTING OK
Ö



164
ROOF, CEILING, WINDOWS
Ö



165
POTABLE WATER
Ö



166
WASTE DISPOSAL SYSTEM

X
Waste accumulated at the FLB posing health hazard.

No waste storage facility at the FLB.
Obtain indemnity for using local piggery for food waste mgt. Segregate waste and ensure fluorescent waste are managed according to procedure.
Explore means of evacuating the accumulated waste at the FLB.
R

TELEPHONES/MOBILE RADIOS





167
Are all restricted areas at the facility appropriately signed? (ie. To prohit the use of non-intrinsically safe radios/phones)
Ö



168
During the visit, were any GSMs or radios used in production areas?

X
Observed personnel had hiscell phone on..
Enforce no use of cell phones in FS.
169
Were these labeled as being intrinsically safe?

X


170
Is the telecom mast maintained according to an approved maintenance schedule/
Ö



171
Is faulty lighting replaced by qualified people when required?
Ö



172
Is this mast labeled as being a hazardous area?
Ö



S
OVERHEAD GANTRIES




173
Are Safe Working Loads (SWLs) clearly indicated on all lifting equipment?
Ö

They are however due end June.

174
Are inspection/examination dates clearly labeled?
Ö



175
Are inspection/examination dates adhered to?




176
Are all lifting equipment appropriately color coded using SPDC system?
Ö



177
Are  all lifting equipment appropriately stored in a suitable, secure location under cover and dedicated to the purpose?
Ö



178
Any damaged lifting gear visible during the visit?
Ö



T
GUARDING




179
Is all moving, rotating, sliding or reciprocating machinery adequately guarded.
Ö



180
Appropriate safeguards (fixed, interlocking, trip guards) are in place, operational and maintained for all equipment
Ö



181
Warning labels are used for all machinery safeguard that has been overridden?
Ö



182
All generators equipped with adequate enclosures
Ö



183
Adequate grating is provided for all gantry systems
Ö



U

FIRST AID BOX





184

First aid box available



No longer kept in FS because of theft. Its however within reach at the FLB clinic.

185

Log book indicating when the 1st aid box was used and which items were used

Ö



186

Is a list available showing the required minimum contents of first aid box?

Ö



187

Anti snake venom available

Ö



188

Is the first aid box replenished when under 50% full?

Ö



189

Is there an appropriate number of qualified first aiders available on site?

Ö



V

SHOC CARDS





190

SHOC cards available for the chemicals on facility

Ö



W

GENERAL





191
GRASS CUT
Ö



192
STATION TIDY

X
Items for replacement lying around. Due to ongoing maintenance activitiy .

193
STATION GUARDS COMMENTS





FIELD LOGISTICS BASES





PORTABLE WATER/FRESH WATER




194
Is there a reliable source of treated water for drinking?
Ö



195
Has this been approved by the medical department?
Ö



196
Is this water stored in a tank free from rust and leaks?
Ö




TOILETS/SINKS (SANITARY CONDITION




197
Are there sufficient toilets available (1 toilet per 15 people)
Ö



198
Are these kept clean?
Ö



199
Are washing facilities  available  with washable flooring?
Ö



200
Are there facilities on-site or nearby for washing clothes?
Ö




MOSQUITO NETS




201
Are all accommodation and office facilities provided with mosquito nets?
Ö



202
Are any of these damaged?
Ö




AIR CONDITIONING




203
Are all offices equipped with air conditioning units?
Ö



204
Are the airconditioning units adequately maintained and tagged?
Ö




KITCHEN HYGIENE/FOOD TRANSPORTATION




205
Independent 6-monthly catering hygiene audits are undertaken by SPDC OH staff (including refuse and storage areas)
Ö



206
Monthly catering checklists are completed by appropriately trained catering staff?

X
No catering supervisor from corporate catering on site since resumption of catering activity 2 weeks ago
Cold room bad.
No emergency lighting in kitchen and mess.
Expeller not functioning properly

207
Kitchen floors are durable, slip-resistant, non-absorbent, coven to the wall and without cracks or crevices.

X
Kitchen facility requires maintenance repairs.


SEPTIC TANK




208
Is the septic tank inspected according to an approved
Ö



209
Is the inspection scheme available on site?
Ö



210
Are there any signs of leakage (staining =, odours, etc)
Ö




PEST CONTROL




211
Are mosquito nets used for offices & accommodation?
Ö



212
Is rubbish removed regularly?

X
Non availability of gun boats to escort marine vessel has hindered regular evacuation of waste to KI.


OFFICES




213
Have ergonomic assessments been undertaken for all workstations?
Ö



214
Periodic cleaning undertaken?
Ö




RECREATIONAL FACILITIES




215
In accommodation areas, facilities are provided for recreational purposes (games, reading room and materials and TV room)
Ö




SMOKE DETECTORS




216
Are these maintained according to an approved maintenance schedule?

X


217
Are there adequate smoke detectors present in critical locations?
Ö




EMERGENCY ALARMS




218
Are emergency alarms functioning properly?
Ö

Alarm not heard at the jetty
Ensure alarm is heard at the jetty.
219
Any emergency alarms present with broken glass or missing hammer?
Ö



220
Are the emergency alarms periodically tested?
Ö



221
Is there evidence of this?
Ö




FIRE HYDRANT TANKS




222
Are the fire hydrant tanks maintained according to an approved maintenance schedule?
Ö



223
Are inspection dates present on all fire tanks?
Ö



224
Are they functioning ?
Ö



225
Are the tanks adequately filled according to minimum requirements?




226
Is the minimum bar indicator present and functioning?





FIRE PUMPS




227
Are the fire pumps maintained according to an approved maintenance schedule?
Ö



228
Are the pumps tested and records available?
Ö



229
Are the fire pumps appropriately labeled?
Ö




EMERGENCY LIGHTING
Ö



230
Is the emergency lighting periodically maintained according to a maintenance schedule?
Ö



231
Is the emergency lighting periodically tested and records available?
Ö




MUSTER POINT/EXITS




232
 Are Muster points adequately labeled?
Ö



233
Are safety signs (emergency exits, escape routes etc) prominently displayed?
Ö



234
Are any muster points or emergency exits obstructed?
Ö



235
Are evacuation/emergency notices strategically located throughout the facility
Ö



236
CONDITION OF GATE/FENCE : Is the fence adequate to keep unauthorized people out of restricted operation areas?
Ö



237
Is the fence periodically inspected? If so how often and is the schedule available?
Ö



238
Is the 3 meter fire break surrounding the perimeter fence provided to prevent the spread of an accidental bush fire?
Ö



239
Is railing fitted where there is the possibility of failing into water or from a height of more than one?
Ö



240
Is railing fitted where there is the possibility of falling into the water or from a height of more than 1 meter?
Ö




HELIPAD




241
Is the helipad lighting maintained according to an approved maintenance schedule?
Ö



242
Are emergency boxes available and maintained according to minimum stock requirements?
Ö



243
Are the walkways to the helipad clearly visible and maintained free from obstructions?
Ö






________________________
 (For  Inspector)

Comments

Popular posts from this blog

Construction Procedure of Surface Road Side Drainage-PART 1 (with picture)

Surface water ( i.e., rain water) that falls on the ground surface such as; open field, paved areas or road surface, roof tops etc are channeled to a main drain naturally or through a constructed channel which is referred to as drainage. Procedure for construction of a common drainage (trench) (1m x 1m U drainage) (reinforced). includes; I.       Marking Of Alignment: The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the trench to be excavated with a mechanical excavating machine. For a 1m x 1m drainage, the mathematical process of obtaining the required dept is to sum together the dept of the required drain + base + blinding. For dept:  A drain of dept1000 mm, base of 150 mm and blinding of 50 mm. Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the road surface. For width:

Ring / Pipe Culverts Construction procedure

Culvert is an open/close drain structure that allows water to flow below a road. It’s like a tunnel carrying a stream of water flow. A Ring/Pipe Culvert Procedure for construction of a common Ring/Pipe Culvert (road junction culvert) includes; I.       Marking Of Alignment: - The surveyor marked out the alignment for the trench to be dug. II.       Digging/Excavation: The surveyor marked out the dept of the culvert to be excavated with an excavating machine. For a 1m pipe culvert, the mathematical process of obtaining the required dept is to sum together the total width of the pipe + base + blinding. For dept:  A pipe of width 1000 mm, base of 150 mm and blinding of 50 mm (though optional). . Hence 1000mm + 150mm + 50mm = 1200mm (1.2 m) So an excavation of 1200mm (1.2m) is required from the to level of the natural ground (sub grade level) surface. For width: A minimum of (2.5 x width) m is advisable.  

Construction Procedure of Surface Road Side Drainage-PART 2 (with picture)

  V.        Next step is laying of concrete base on the blinded surface and the positioned reinforcement. A concrete base of 150 mm is to be laid or cast on the blinded floor, concrete grade C20 of ratio 1:2:4 is allowed (See concrete grading and mix ratio). A guiding panel is placed into position to guild in the laying of the concrete base in order to achieve a uniformly alignment base edge, thickness and width, also to manage concrete material while pouring. The base is cast with the U shape reinforcement bottom in between the concrete base achieving concrete cover below and above.   VI.        After setting and drying of the concrete base, next is to position the side wall panel form work. The floor base is marked to give the required one meter (1000 mm) internal width where the panel will be positioned. The panel wall spacing is 100mm, and wall height of 1000mm (1 meter), the panel is lubricated, clipped and prepared to accept the Concrete.